About the job
About align46
align46 is a general contractor focused on data center white space solutions. The team specializes in fit-outs for data centers across the country, handling everything from layout design and overhead support systems for cable pathways to electrical distribution, conduit planning, and low-voltage structured cabling. The company values professionals who are innovative, results-driven, and eager to make an impact in the industry.
Role Overview
The Data Center Construction Project Manager will lead projects related to electrical and mechanical distribution within data centers. This includes managing the build from upstream critical equipment through to computing, storage, and networking infrastructure. The role requires a strong understanding of design intent and customer requirements, with responsibility for delivering projects to specification.
Key Responsibilities
- Oversee daily on-site construction activities for data center white space projects in Ohio
- Manage schedules and quality control in the field
- Coordinate with construction trades and subcontractors
- Ensure delivery meets design intent and client expectations
- Work with teams on layout design, overhead cable pathways, electrical support systems, power striping, redundancy planning, conduit pathways, and low-voltage cabling
Location
This position is based in Ohio and requires daily on-site presence.

